Methods of Payment:
1.1 T/T (Telegraphic Transfer) or WesternUnion or L/C at sight1.2 Normally, we require 30% down payment at the time of order and 70% before shipment.
1.1 T/T (Telegraphic Transfer) or WesternUnion or L/C at sight1.2 Normally, we require 30% down payment at the time of order and 70% before shipment.
Asphalt distributorWithin 35 daysAsphalt distributor(with right hand chassis)Within 45 daysSynchronous chip sealerWithin 35 daysMicro surfacingWithin 45 daysChipping SpreaderWithin 15 daysAsphalt emulsion plant Within 25 daysOther machinesWithin 20 days*For reference only
3.1 Asphalt distributor≤5000L, Chippingspreader, Asphalt emulsion plant, Drummed asphalt decanter and etc. can beshipped by Container. 3.2 Micro –surfacing, Synchronous chipsealer, Asphalt distributor≥6000L and etc. We suggest the shipment will be madeby roll-on/roll-off ship or Bulk Carrier.
It would be around 15 days.